In the first interim order passed in the present case in April 2024, TWC (Plaintiffs) was allowed to take possession of two aircraft in the capacity of a receiver and not move them without the orders of the Court and the engines were allowed to be used by SpiceJet.
However, by way of the present order, the two aircraft and three engines were directed to be handed over to TWC unconditionally.
"This Court has no option but to direct that the aircrafts along with the engines along, with all relevant records relating to technical condition and usage of aircrafts shall be handed over to the Plaintiff by 28th May, 2024," the Court ordered after noting that SpiceJet failed to pay lease rent dues to TWC Aviation.
In the first interim order passed in the present case in April 2024, TWC (Plaintiffs) was allowed to take possession of two aircraft in the capacity of a receiver and not move them without the orders of the Court and the engines were allowed to be used by SpiceJet.
However, by way of the present order, the two aircraft and three engines were directed to be handed over to TWC unconditionally.
"This Court has no option but to direct that the aircrafts along with the engines along, with all relevant records relating to technical condition and usage of aircrafts shall be handed over to the Plaintiff by 28th May, 2024," the Court ordered after noting that SpiceJet failed to pay lease rent dues to TWC Aviation.